Merck

Location: Boston, Massachusetts

The Challenge

Excessive heat gain through clear IG windows stressing building chillers.

Lobby glass required 11 stories of scaffolding erected, broken down, moved and re-erected in three separate locations during the installation.

The Solution

80K sf of 3M Low E 35 energy film mounted on more than 3,000 windows.

Duration:  4.5 months

The Result

Johnson Control engineers report that the 3M low E film effectively reduced heat gain through windows improving HVAC function and overall building performance.

ROI: <2 years

Utility Rebates: Yes

Downtown Hilton

Excessive heat gain through windows making guests uncomfortable and taxing chillers during peak demand throughout the summer months.

As an operating hotel, management required WFD project managers to provide strict scheduling and timelines based on daily room availability.

Read Case Study