Merck

Location: Boston, Massachusetts
The Challenge
Excessive heat gain through clear IG windows stressing building chillers.
Lobby glass required 11 stories of scaffolding erected, broken down, moved and re-erected in three separate locations during the installation.
The Solution
80K sf of 3M Low E 35 energy film mounted on more than 3,000 windows.
Duration: 4.5 months
The Result
Johnson Control engineers report that the 3M low E film effectively reduced heat gain through windows improving HVAC function and overall building performance.
ROI: <2 years
Utility Rebates: Yes
World of Coca-Cola
The natural light filled Coke Museum in Atlanta created a situation where excessive UV exposure on precious items required a sun screen for the massive curtainwall of glass.
The 20K square feet of 3M film was installed after hours and required the use of a ‘spider lift’ to access the upper rows of the atrium glass.
READ CASE STUDY