Merck

Location: Boston, Massachusetts

The Challenge

Excessive heat gain through clear IG windows stressing building chillers.

Lobby glass required 11 stories of scaffolding erected, broken down, moved and re-erected in three separate locations during the installation.

The Solution

80K sf of 3M Low E 35 energy film mounted on more than 3,000 windows.

Duration:  4.5 months

The Result

Johnson Control engineers report that the 3M low E film effectively reduced heat gain through windows improving HVAC function and overall building performance.

ROI: <2 years

Utility Rebates: Yes